The section contains questions and answers on quantity measurement and calculations, arch masonry calculations, masonry platform, water tank, motor garage, single and double room building estimation, circular and hexagonal rooms, office and shop buildings, mixed masonry, line planned and storeyed buildings.

1 / 47

1. Pick up the excavation where measurements are made in square metres for payment.

2 / 47

2. The expected out turn of 2.5 cm cement concrete floor per manson per day

3 / 47

3. A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.

4 / 47

4. The correct prismoid formula for volume is

5 / 47

5. The order of booking dimensions is

6 / 47

Carpet area does not include the area of

7 / 47

The cross-sections for a highway is taken at

8 / 47

The assumption on which the trapezoidal formula for volumes is based, is

9 / 47

The measurement is not made in square metres in case of

10 / 47

If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is

11 / 47

Pick up the incorrect statement from the following:

12 / 47

The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

13 / 47

While estimating a reinforced cement structure, the omitted cover of concrete is assumed

14 / 47

The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

15 / 47

Pick up the item whose weight is added to the weight of respective item, is

16 / 47

Cost of fittings and their fixing is specified for the following sanitary fittings

17 / 47

The area is measured correct to the nearest

18 / 47

The damp proof course (D.P.C.) is measured in

19 / 47

The main factor to be considered while preparing a detailed estimate, is

20 / 47

The expected out turn of 12 mm plastering with cement mortar is

21 / 47

The most reliable estimate is

22 / 47

The value of 'C' of Indian type W.C. shown in the given figure is :

Civil Engineering MCQs

23 / 47

The item of steel work which is measured in sq.m, is

24 / 47

The inspection pit or chamber is a manhole provided in a base drainage system

25 / 47

The item of the brick structure measured in sq.m, is

26 / 47

The minimum width of a septic tank is taken

27 / 47

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

28 / 47

The plinth area of a building not includes

29 / 47

The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

30 / 47

Pick up the correct statement from the following:

31 / 47

The concrete work for the following part of the building of specified thickness is measured in square metres

32 / 47

Pick up the incorrect statement regarding a master trap from the following :

33 / 47

While preparing a detailed estimate

34 / 47

The height of the sink of wash basin above floor level is kept

35 / 47

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

36 / 47

In case of laying gullies, siphons, intercepting traps, the cost includes

37 / 47

Pick up the correct statement in case of water supply.

38 / 47

Brick walls are measured in sq. m if the thickness of the wall is

39 / 47

The brick work is measured in sq metre, in case of

40 / 47

Pick up the correct statement from the following:

41 / 47

Pick up the item of work not included in the plinth area estimate

42 / 47

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

43 / 47

The value of 'A' of Indian type W.C. shown in the given figure is :

Civil Engineering MCQs

44 / 47

The 'centre line method' is specially adopted for estimating

45 / 47

The measurement is made for stone work in square metre in case of

46 / 47

For the construction of buildings, the subheads of the estimate are

47 / 47

For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is