CPWD Specifications, PRECAST REINFORCED CONCRETE

PRECAST REINFORCED CONCRETE

PRECAST DOOR AND WINDOW FRAMES

Measurements

The length shall be measured in running metre correct to a cm along the centre line of the frames.

PRECAST CEMENT CONCRETE JALI

Measurements

The jali shall be measured for its gross superficial area. The length and breadth shall be measured correct to a cm. The thickness shall not be less than that specified.

EXPANSION JOINT COVERING WITH CEMENT BONDED PARTICLE BOARD

Measurement

The length of sheet shall be measured correct to a cm.